Capital Repair of Turnouts for JSC “Ukrzaliznytsia”

2025
No items found.

Under a contract with the regional branch “Odesa Railway” of JSC “Ukrzaliznytsia”, Archizem specialists prepared design and estimate documentation for the capital repair of turnouts. The documentation was developed in full compliance with applicable legislation, standards, and regulations. The facility falls under Consequence Class CC3, and the project received a positive conclusion of the State Expert Review.

As part of the assignment, Archizem delivered:

  • a full scope of engineering-geological and engineering-geodetic investigations;
  • design solutions for horizontal and vertical alignment correction, turnout replacement and renewal of the adjacent tie-in sections, and rehabilitation of the formation and drainage structures (Railway Track section);
  • design solutions for utility relocation (Signalling and Telemechanics section);
  • an Environmental Impact Assessment (EIA);
  • a Construction Organization Plan (COP);
  • preparation of bills of quantities, specifications, and cost estimates;
  • coordination with the client and support throughout the expert review process.

As a result, the client received a complete documentation package and end-to-end engineering support for implementation, aimed at improving operational reliability and increasing train speeds.

Similar projects:

Capital Repair of Receiving-Departure Tracks for JSC Ukrzaliznytsia

Under a contract with the regional branch “Odesa Railway” of JSC “Ukrzaliznytsia”, Archizem delivered a complete design and estimate documentation package for the capital repair of receiving-departure tracks with a total length of 1.56 km. The documentation was prepared in compliance with applicable legislation, construction codes, standards, and regulations. The facility is classified as Consequence Class CC3, and the project received a positive conclusion of the State Expert Review.
SEE DETAILS

Capital Repair Design for the Odd-Numbered Main Track (JSC Ukrzaliznytsia)

Archizem specialists prepared the design and estimate documentation under a contract with the regional branch “Odesa Railway” of JSC “Ukrzaliznytsia” for the capital repair of a 3.414 km main-line section. The facility is classified as Consequence Class CC3. The documentation was developed in compliance with applicable legislation, construction codes, standards, and regulations and successfully passed expert review, resulting in a positive conclusion of the State Expert Review.
SEE DETAILS

Free data audit and calculation — within 24 hours.

Submit your request

Our specialists will conduct a free analysis of your source data and provide a detailed proposal with cost and timelines within one business day.
Grazie! Your submission has been received!
We have received your request and will contact you shortly
Oops! Something went wrong. Please try again.